Marmore Falls water release times

Marmore Falls

A rainbow arching over the Marmore Falls in full flow during a water release
The falls in full flow during a release, with the rainbow that forms in the spray on a sunny day. Photo: SpessiG, Wikimedia Commons, CC0

Source: the official Cascata delle Marmore calendar, published month by month in Italian. Rather than chase every monthly tweak, this page explains the pattern behind that calendar – the shape of the whole year – and shows you exactly what to check for your date. We live in the village above the falls.

Marmore Falls is switched on and off. The River Velino normally feeds the Galleto hydroelectric power station; at published times each day the plant releases the water over the cliff instead, and the falls go – within a few minutes – from a quiet veil to full thunder. If you only plan one thing about your visit, plan around this timetable.

The water release timetable, season by season

The Comune publishes exact times month by month, but the shape of the year barely changes. Plan with the pattern below, then confirm your exact day on the official calendar – one link, ten seconds; how-to underneath the table.

SeasonWeekdaysWeekends & holidays
Summer
(June–August)
Long releases through the day – in August typically 10:00–19:00 plus an illuminated evening window around 21:00–22:00, every dayThe year’s most generous schedule – near-continuous daytime water, with evening releases on Saturdays in June, Saturdays and Sundays in July, and every evening in August, Ferragosto included
Spring & early autumn
(March–May, September)
Typically two windows – one around midday, one mid-to-late afternoonUsually two windows, longer than on weekdays from May (in May 10:00–13:00 and 15:00–18:00, in early September 11:00–18:00 straight through); Easter, 25 April and 1 May run close to all day
Late autumn
(October–November)
Windows shrink and the park closes earlier (typically 17:00 or before); in November there is no weekday release at allTwo shortish windows – late morning/midday and mid-afternoon
Winter
(December–February)
The leanest season – apart from the Christmas and New Year holiday dates, weekdays have no release at allShort windows around midday and early-to-mid afternoon; December adds releases on the holiday dates, weekdays included (7–8, 24–25 and 28–31 December, 12:00–13:00 and 15:00–16:00)

On winter days with no scheduled release, the park still opens and the ticket drops to €6 (official ticket page).

How to check your exact day (the only step that matters)

Open the official opening times page and find your month. It’s in Italian, but you only need three words – feriali (weekdays), sabato (Saturday), domenica (Sunday) – and one distinction: the park’s opening hours and the water-release hours are listed separately, and it’s the release (rilascio) hours that decide what you’ll see. The park itself warns that times can change at short notice, so check close to your visit – especially for winter weekdays and holiday weekends.

How the release actually works (worth reading once)

A siren sounds shortly before the water is released – if you hear it, you’re about to see the best free show in Umbria, so get to a viewpoint. The falls take a few minutes to build to full flow. Releases are longest at weekends and on Italian holidays; on winter weekdays there is normally no release at all, which is the single most common cause of disappointed reviews. On summer Saturday evenings the release runs late with the falls illuminated – if your dates allow one thing, allow that.

Marmore Falls floodlit at night, the upper leap and lower cascades glowing white against dark woods and a deep blue sky
An evening release. In 2026 these ran on June Saturdays, July weekends and every night in August. Photo: Milarix, Wikimedia Commons, CC BY-SA 3.0

Outside the release windows the Velino doesn’t disappear. It is diverted into the Galleto power station’s penstocks and drops about 200 metres through the turbines instead of over the cliff (Ingenium, Ordine degli Ingegneri di Terni).

The three rules that never change

  • The water is scheduled, not constant. Match your ticket and your arrival to a release window – nothing else about the visit matters as much.
  • Weekends and Italian holidays always get the longest releases; winter weekdays get the shortest – and sometimes none. Coming between November and February on a weekday? Check before you drive.
  • If you can pick one moment of the year, pick a summer evening release with the falls illuminated – and whatever the season, arrive before the switch-on: the transformation is the show.

Timing your visit around the release

Our local’s routine: arrive 45 minutes before the release, walk to your chosen viewpoint while the paths are quiet, watch the switch-on (the transformation is the point – the before/after is what you’ll remember), then do the trails at full flow. If you’re eating afterwards, book – the nearby tables fill on release-time rhythms too.

The first leap of Marmore Falls at full flow, a faint rainbow in the spray and the green valley opening out behind
With sun on the spray, a release often brings a rainbow; clear days around midday give the best chance. Photo: Tulumnes, Wikimedia Commons, CC BY-SA 4.0

Frequently asked questions

Why is there a timetable at all?

The water works for a living. Since the 1920s the Velino has fed the Galleto hydroelectric plant; tourist releases are scheduled windows when the flow is sent over the falls instead. The full story is on our history page.

What happens if I arrive outside release hours?

You’ll see the cliff, the gorge and a modest veil of water – impressive geology, absent drama. The park is still open; the falls just aren’t performing. Time your ticket to the window.

Is the siren dangerous?

It’s a warning to stay out of the riverbed, which you should never be in anyway. On the marked paths and balconies you’re safe – just expect spray on Trail 1’s Lovers’ Balcony (trails guide).

Where do I check the official schedule?

The official site publishes the full-year calendar (in Italian) at cascatadellemarmore.info/orari-e-aperture – that page is the source of truth for exact times on your date. This page explains the seasonal pattern behind it, which changes far less than the month-to-month details. If something here looks out of step with the official calendar, tell us – we fix things fast.

From the journalEvery release window in 2026 – and the four months with no midweek water — the published calendar, month by month.


Free guide

Marmore Falls Water-Release Planner

The falls only run during scheduled water releases — this free printable planner shows how the timings work and how to catch the falls at their most dramatic, with the rainbow.

  • How the release schedule works through the year
  • The best midday windows for the rainbow
  • What to bring and where to stand
Get the free guide
Palazzetto Manassei Form

Scroll to Top